Pouring

Home»Home Owners»Pouring

 The Pour


"With all boxing and steelwork approved everything is ready to pour. The first truckload in a Slab Works job is dedicated to the ribs between the pods.

A major difference with a Slab Works floor comes from the use of a concrete vibrator which ensures concrete settlement in the ribs. This removes the weak spots commonly caused by air bubbles.


Subsequent truckloads of top concrete are also vibrated in to ensure a premium slab quality".