The Slab Works System 


  SW_System.png

The consistent quality delivered by a Slab Works crew is due to the Slab Works system – a proven method of checks and procedures which ensure accuracy every time.

The system includes* checklists for: 

  CheckSetOut.jpg


• Confirmation of builder's setout.
• Elimination of sand high spots.
• Strip footings and piers**.
• Bottom boxing and plumbing setout.
• Pod height and concrete coverage.
• Steel overlaps to Australian Standards.
• Master checklist signoff



We’ve often been asked: “Why the need for a house slabs system?”
Well that’s easy, when it is done once and done well, you save time and money.

* The full Slab Works system includes 38 checkpoints which are signed off by the site supervisor.
**Strip footings and piers used where applicable. Note: All jobs conform to Australian Standards.