The consistent quality delivered by a Slab Works crew is due to the Slab Works system – a proven method of checks and procedures which ensure accuracy every time.
The system includes* checklists for:

• Confirmation of builder's setout. • Elimination of sand high spots. • Strip footings and piers**. • Bottom boxing and plumbing setout. • Pod height and concrete coverage. • Steel overlaps to Australian Standards. • Master checklist signoff
|
We’ve often been asked: “Why the need for a house slabs system?” Well that’s easy, when it is done once and done well, you save time and money.
* The full Slab Works system includes 38 checkpoints which are signed off by the site supervisor. **Strip footings and piers used where applicable. Note: All jobs conform to Australian Standards.
|